Residential Service Entrance With Mast



Single Phase 120/240 Volt Service Specifications:

    The following recommendations have the purpose of safeguarding members and employees, and of providing adequate service to all members.

    These recommendations and the specifications listed below are minimum standards. In addition to compliance with these standards, all electrical installations must comply with the National Electric Code and any state or local laws that may be in force at the time.


Recommendations:

All new or renovated single dwellings shall have a minimum main service capacity of 100 amp.
All meters shall be located so as to be exposed and accessible from the outside.
The main service panel shall be located at a readily accessible location nearest the point of entrance of the service entrance conductors.
All conduit threads and threaded or threadless fittings used must be made watertight.
To conform with the National Electrical Safety Code when planning a service, the following minimum clearances.
18 ft.--over
Roads
Driveways
Parking areas subject to truck traffic.
Service conductors shall have a clearance of not less than 3 feet from windows, doors, porches, fire escapes, or similar locations.
Consumer wiring systems and equipment shall not be installed on poles owned by Guernsey-Muskingum Electric Cooperative.
In underground installations, the depth of the trench and the use of conduit are safety measures which must be adhered to. It is advisable to keep underground services to a maximum of 150 ft.
When using aluminum conductors, electric joint compound must be applied at all connections. Copper and aluminum must not be terminated under the same connector unless the connector is of the bi-metal type.
All meters of Guernsey-Muskingum Electric Cooperative are sealed. These seals shall not be broken other than by qualified personnel of the Cooperative or its designated agent.


Specifications:

    It is the responsibility of the member to furnish and have installed the following:

    Please have the location of the service approved by the Cooperative BEFORE work is started.

Size of Service: 100 amp 150 amp 200 amp
Service Entrance Cable Conductor Size:
Type THHN, TW, XHHN, or Equivalent
#2 aluminum or
copper
#2/0 aluminum
or
#1/0 
copper
#4/0 aluminum
or
#3/0
copper
Size of Conduit: 2" 2" 2"

For Aluminum Conductors:  Use aluminum electrical joint compound at all connections.

NOTE: If mast is used instead of entrance cable, the mast must be 2" Galvanized Conduit

 
OUPS
Home Energy Calculator
Touchstone Energy Savers
Kids Corner
EnviroWatts
Touchstone Energy